News

Damaged dumper partially suspends unloading: Rio Tinto

  •  8 September 2008
  • 0 comments
Damaged dumper partially suspends unloading: Rio Tinto

RIO Tinto says its rail car dumper at the Cape Lambert operation in the Pilbara has been damaged, resulting in the partial suspension of iron ore unloading activities.

According to the company, an on-site incident on 31 August 2008 damaged one of five dumpers. Damage assessment and repairs are in progress.

Rio Tinto has changed the rail and shipping schedules in an attempt to minimise capacity loss, and output losses are expected to be negligible.

Between 190m and 200m tonnes of iron ore from Pilbara flow through the Cape Lambert and Dampier ports. Rio is ramping up operations to enable the combined Pilbara operations to export 220m tonnes per year by the end of 2008.

Add a comment

| More
  • Posted in:

Add a comment Comments

No comments found, be the first to add one.
Thank you very much.

Your comment has been submitted.

Required

Please enter your name.

Required, but never displayed.

Please enter a valid email address.

Optional, and linked if provided.

Required and you can write upto 600 words for your comment.

Please enter your comment and limit it to 600 words.

Required

Please enter the code shown on the right.
Check this box to receive the latest updates in our email newsletter.
to get Materials Handling
delivered to your inbox

Recent comments

International bills to pay? Sign up now!